Texas Stadium Implosion Slated for April 11
By Eileen Schwartz, Texas Construction, 04.07.2010

The stadium was completed in 1971 at a cost of $35 million. The team’s new $1-billion-plus home is in Arlington, and features a signature retractable roof designed by Houston-based engineering firm Walter P Moore. The new stadium was built by Manhattan Construction Co. and designed by HKS Inc., both of Dallas, and was completed last year before the start of the 2009 NFL season......read more
ProTech


Hello, man! I'm totally acclaim this way of thinking and everything connected.
Reply to this
This is very informatics article for all readers and this is a nice shearing in my eyes. Keep moving!
Reply to this